HP (Hewlett-Packard) 2610 사용자 설명서

다운로드
페이지 112
2-4
Installing the Switch
Installation Procedures
In
sta
llin
g
 th
e
 Sw
itc
h
Installation Procedures
These steps summarize your switch installation. The rest of this chapter 
provides details on these steps.
1.
Prepare the installation site (
 Make sure the physical 
environment into which you will be installing the switch is properly 
prepared, including having the correct network cabling ready to connect 
to the switch and having an appropriate location for the switch. See 
 
for some installation precautions.
2.
Verify the switch passes self test (
).
 Plug the switch into a 
power source and observe that the LEDs on the switch’s front panel 
indicate correct switch operation. 
3.
Mount the switch (
).
 The 2610 Switches can be mounted in a 
19-inch telco rack, in an equipment cabinet, on a wall, or on a horizontal 
surface. The 2610-PWR Switches may be mounted in racks and cabinets 
or on a horizontal surface.
The 2610-PWR Switches must not be wall mounted. The 2610 Non-PWR 
Switches can be wall mounted. Se
 for wall mounting instruc-
tions.
The following switches can be rack mounted with rail kit part number 
508783-B21.
J9085A ProCurve Switch 2610-24 
J9088A ProCurve Switch 2610-48 
J9086A ProCurve Switch 2610-24/12PWR
4.
Connect power to the switch (
 Once the switch is mounted, 
plug it into the main power source.
5.
Connect the network devices (
).
 Using the appropriate 
network cables, connect the network devices to the switch ports.
6.
(Optional) Install mini-GBICs (
).
 The switch has two slots 
for installing mini-GBICs. Depending on where you install the switch, it 
may be easier to install the mini-GBICs first. Mini-GBICs can be hot 
swapped—they can be installed or removed while the switch is powered 
on.
7.
(Optional) Connect a 600 RPS/EPS or 610 EPS
). You may 
wish to use a 600 RPS/EPS or 610 EPS with your Series 2610-PWR Switch. 
To do so you must connect these external power supplies using the RPS 
or EPS cables supplied with these devices.