Fujitsu BX900 S1 사용자 설명서

다운로드
페이지 144
84
Operating Manual
 BX900 S1
Hot-plug components
©
 c
o
g
n
it
as
. Ges
e
lls
c
h
ft
 f
ü
T
e
c
hni
k
-D
o
k
u
m
e
nt
at
ion m
b
H 20
10 
P
fa
d
C
:\
P
rogra
m
m
e
\F
C
T
\t
im
_a
pp
\t
im
_l
o
c
a
l\
w
or
k
\W
A
LT
E
R
\O
B
J
_
D
O
K
U
-4
9
5
3
-0
06
.f
m
To achieve optimum cooling of the system unit, observe the following sequence 
when filling the server blade slots:
1 - 2 - 3 - 4 - 17 - 9 -10 - 11 - 12 - 18 - 5 - 6 - 7 - 8 - 13 - 14 - 15 - 16. All empty 
server blade slots must be fitted with dummy modules.
I
The maximum number of installable server blades depends on the 
number of power supply units and fan modules fitted in the system unit, 
the available mains voltage and the redundant power supply 
requirements, see 
.
Different models and configurations of server blades can be combined in the 
system unit.
Installing a server blade
V
CAUTION!
Make sure you observe the safety notes and the information on 
handling electrostatic-sensitive devices in the section 
Beware of the energy hazard at the midplane contacts. A short circuit 
on these contacts may damage the system.
The server blade boots automatically after installation in the 
system unit.
When you install a server blade in an active system unit, the server 
blade automatically performs a Power-On Self-Test (POST) and then 
switches itself off.
If the system unit is switched off when you install the server blade, the 
automatic POST is performed immediately after you switch on the 
system unit.
Any unused server blade slots must be fitted with dummy modules to 
comply with electromagnetic compatibility (EMC) regulations and to 
ensure sufficient cooling of the system components.
Installing a single height / single width Blade
The following describes how to install a BX920 S1 server blade. Storage blades 
are installed in the same way.