Fujitsu 2000 SERIES 사용자 설명서

다운로드
페이지 285
CHAPTER 4 PCI Card Hot Maintenance in Red Hat Enterprise Linux 6 
4.2 Hot add of SB 
62 
 
C122-E175-01EN 
 
4.2.4  How to deal with when timeout occurs while OS is processing SB 
hot add 
If OS does not finish the process of SB hot add within predetermined time, timeout message “DR sequence 
timeout: SB hot-add OS failure” is shown on MMB CLI. 
It means that DR completion message from OS does not arrive at MMB. In such case, some collaboration 
programs may hang though DR process is still running on OS. Rebooting the partition is recommended 
because it is difficult to estimate when the process will be completed. 
The process of SB hot add by OS can be mainly divided into three parts. Check /var/log/message, analyzing 
which process takes a lot of time. 
Pre-process of collaboration program 
Activating added resources 
Post-process of collaboration program 
1.  Checking pre-process of collaboration program 
Process of below messages in /var/log/messages is pre-process of the collaboration program. 
Dec 17 00:15:33 xxx dp-util[4457]: INFO : 800 : Detected SB 
hot-add 
Dec 17 00:15:33 xxx dp-util[4457]: INFO : 801 : Added SB3, 
Node6,7 
Dec 17 00:15:33 xxx dp-util[4457]: INFO : 807 : Execute 1 
user programs at ADD_PRE timing 
... 
Dec 17 00:15:34 xxx dp-util[4457]: 10-FJSVdp-util-kdump-
restart : INFO : start 
... 
Dec 17 00:15:34 xxx dp-util[4457]: 10-FJSVdp-util-kdump-
restart : INFO : result: 0 
... 
Dec 17 00:15:34 xxx dp-util[4457]: INFO : 808 : Executed 
user programs at ADD_PRE timing 
If “INFO : 808 : Executed user programs at ADD_PRE timing” is not output, pre-process of the 
collaboration program is delayed. Check which collaboration program takes a lot of time by seeing 
/var/log/messages and ‘collaboration program name.log’ made in /opt/FJSVdp-util/var/log directory, if any. 
The developer of the collaboration program can be confirmed by below rpm command. Ask the developer 
about the cause of its delay. 
(Example) Checking the developer of the collaboration program “10-FJSVdp-util-kdump-restart” 
$ rpm -qif /opt/FJSVdp-util/user_command/10-FJSVdp-util-
kdump-restart 
... 
Rebooting the partition is recommended because SB hot add process has been imperfect state. 
2.  Checking the time for activating added resources 
Process of below messages in /var/log/messages is the process of activating added resources. 
Dec 17 00:15:34 xxx dp-util[4457]: INFO : 802 : Add CPU30-59 
(total 30) 
Dec 17 00:15:34 xxx dp-util[4457]: INFO : 804 : Add 
MEM98304-98559,114688-114943 (total 67108864 kiB) 
... 
Dec 17 00:15:47 xxx dp-util[4457]: INFO : 809 : Added SB3 
If “INFO : 809 : Added SBX” is not output, process of activating added resources is delayed. Check that 
the process of adding CPU or memory is performed by executing below command at several seconds. 
-  Checking the number of CPU 
$ grep -c processor /proc/cpuinfo 
30 
-  Checking the size of memory 
$ cat /proc/meminfo |grep MemTotal