Nortel Networks 1000M 사용자 설명서
Installing DC power
Page 107 of 456
Communication Server 1000M and Meridian 1
Large System Installation and Commissioning
Installation Manual (P7000289) for the Small Candeo system. The
installation manuals cover the following topics.
installation manuals cover the following topics.
Large Candeo
1
Site Preparation — Overview, tools and test equipment, precautions, and
receiving materials.
receiving materials.
2
Locating and Erecting Frames — Locating and installing the frame on
various floor types and consideration for earthquake anchoring. Included
also are procedures for isolating the frame for ISG (isolated system
ground).
various floor types and consideration for earthquake anchoring. Included
also are procedures for isolating the frame for ISG (isolated system
ground).
3
Cabling and Connecting — Basic rules, connecting AC to rectifiers,
connecting DC cables from batteries, connecting DC loads and
miscellaneous cabling. This section details all grounding for frame as
well as battery return connections. Under connecting the DC load cables
details on wiring and installing the load clips, fuse blocks and breakers
are detailed. Miscellaneous cables details remote sensing to batteries,
input ports and alarm connections, communication port connections to
connect to RS-232, Ethernet or external modem.
connecting DC cables from batteries, connecting DC loads and
miscellaneous cabling. This section details all grounding for frame as
well as battery return connections. Under connecting the DC load cables
details on wiring and installing the load clips, fuse blocks and breakers
are detailed. Miscellaneous cables details remote sensing to batteries,
input ports and alarm connections, communication port connections to
connect to RS-232, Ethernet or external modem.
4
Startup and Adjustment Procedures — The Candeo system comes pre
configured with the Distribution 500 and Battery Connection Kit
installed. In this section the rectifiers are added and the system is
powered up and will go through a self test. At this point, see Chapter 5
“Configuring and Operating the Candeo Power System” in the user
manual (UM6C75).
configured with the Distribution 500 and Battery Connection Kit
installed. In this section the rectifiers are added and the system is
powered up and will go through a self test. At this point, see Chapter 5
“Configuring and Operating the Candeo Power System” in the user
manual (UM6C75).
5
End of Job Routines and Turnover — This section covers end of job
routines such as designating circuits, numbering frames, installing the
top cover, optional doors and turn over to the customer.
routines such as designating circuits, numbering frames, installing the
top cover, optional doors and turn over to the customer.
Small Candeo
1
Preparation — Overview, tools and test equipment, precautions, and
receiving materials.
receiving materials.
2
Locating the system — Mounting the power system shelves in existing
facilities and bridging the supplementary distribution panel, if furnished,
to the initial distribution panel.
facilities and bridging the supplementary distribution panel, if furnished,
to the initial distribution panel.