Polycom 1725-36032-001 사용자 설명서

다운로드
페이지 40
SpectraLink 8000 SVP Server: Administration Guide for SRP 
• 
A maximum distance of 325 feet (100 meters) from the Ethernet 
switch. 
Install the SVP Server 
The SVP Server may be mounted on a rack or to a wall. 
Mount the SVP Server on a rack 
The rack mount kit is designed for mounting equipment in a standard 
19” rack and should contain the following equipment:  
†  Mounting plates
– two for each SVP Server to be mounted. 
†  Screws
– four rack mount screws for each SVP Server to be 
mounted.  
To rack-mount the SVP Server: 
1.  Remove the corner screws from the SVP Server 
2.  Screw the U-shaped end (round screw holes) of the two mounting 
plates to the SVP Server. 
3.  Screw the other end of the two mounting plates (oblong screw 
holes) to the rack. 
4.  Repeat steps 1-3 for each additional SVP Server. The mounting 
plate is designed to provide the correct minimum spacing 
between units. When mounting multiple units, stack the units in 
the rack as closely as possible. 
Mount the SVP Server to a wall 
The SVP Server can be mounted either horizontally or vertically.  
To mount the SVP Server: 
1.  Using a 1/8-inch drill bit, drill four pilot holes, on 1.84-inch by 
12.1-inch centers (approximately equivalent to 1-13/16” by  
12-1/8”). 
2.  Insert the #8 3/4-inch screws in the pilot holes and tighten, 
leaving a 1/8-inch to 1/4-inch-gap from the wall.  
PN: 1725-36032-001_F.doc 
16