APC PMP3XS-B 사용자 설명서

다운로드
페이지 24
Installation and Operation Manual 
11
Location of SPD
Install Type 2 SPDs on the load side of the main Overcurrent Protection Device 
(OCPD) to comply with NEC Article 285 for Type 2 SPDs.
Locate the SPD as close as possible to the circuit being addressed to minimize 
the wire length and optimize SPD performance. Avoid long wire runs so that the 
device will perform as intended. To reduce the impedance that the wire displays 
to surge currents, the phase, neutral, and ground conductors must be routed 
within the same conduit and tightly bundled or twisted together to optimize 
device performance. Avoid sharp bends in the conductors. See Figure 2.
Figure 2:
SPD Wiring
To load(s)
Phases
Neutral
Ground
Ground bus
Neutral bus
SPD
Phase A
Phase B
Phase C
Neutral
Ground
Panel
Interconnect wiring
– Minimize length
– Avoid sharp bends
Location