IBM AIX 4.3 사용자 설명서

다운로드
페이지 62
Chapter 4. Starting the migration 
19
As the NIM master in a NIM environment has to be at the highest available AIX level, we set 
up the NIM master at AIX 5L Version 5.2 with maintenance level 02. If your NIM master is 
based on AIX Version 4.3.3, we recommend that you migrate the NIM master first to AIX 5L 
Version 5.1 or 5.2 before starting to migrate the clients. For more information on how to set up 
the NIM master refer to the AIX 5L Version 5.1 Network Installation Management Guide 
located on the AIX Documentation CD; NIM: From A to Z in AIX 4.3, SG24-5524; or AIX 
Version 4.3 to 5L Migration Guide
, SG24-6924, which is also valid for AIX 5L.
There is nothing special to consider for the NIM master when you start a migration installation 
on your clients.
For our migration we created the necessary AIX 5L Version 5.1 lpp_source and SPOT 
resources by installing the content of all AIX 5.1 CDs into one lpp_source NIM resource and 
used this lpp_source as the base installation device. Figure 4-2 shows the Web-based 
System Manager launch panel for the test system NIM operation.
Figure 4-2   WebSM NIM launch panel
Beginning with AIX 5l Version 5.1, software license agreements are shipped and displayed 
electronically, saving paper and allowing for electronic software distribution in the future. If you 
start a migration over NIM, you have to check the “Accept new licence agreements” box, as 
shown in Figure 4-3.