Haier BD-478A 사용자 설명서

다운로드
페이지 61
 
 
 
31
(5) Remove the compressor. 
(6) Install  new  compressor  and  new  filter  dryer  and  weld  them.  The  open 
time of system shall not be more than 10 min. 
(7) Connect  the R134a recovery unit to the  low sideline of the  compressor, 
and then evacuate. The evacuation time shall not be less than 45 min. 
(8) Fill system with R134a according to its original quantity. 
(9) Check if there is any leakage at welded point by using soapsuds. 
(10) 
Use clean gauze to wipe away welding powder and flux. 
(11) 
Connect the electrical controlling unit of compressor. 
(12) 
Mount and adjust temperature controller. 
(13) 
Switch on power for test run, check unit operation. 
12.3.5 Compressor installation and brazing procedures 
(1) Install new compressor. 
(2) Compressor is not allowed to suck in air directly for check or other test. 
MAINTENANCE SERVICE AND TROUBLE SHOOTING
 
Maintenance Service and Trouble Shooting
 
(3) When changing with new compressor during service, the seal plug shall 
be opened last and make the brazing and evacuation immediately. 
PDF created with pdfFactory trial version