Hoshizaki KM-1300MWH 사용자 설명서

다운로드
페이지 62
18
[c] SEQUENCE
1st Cycle
1. Unit energized and Control Switch to “ICE”
    position.  Water supply cycle starts.
3.  Thermistor reads 48°F.
     Defrost Timer starts counting.
2. After 1 minute,
    Defrost cycle starts.
5.  After the first 5 minutes in freeze cycle.
     Ready to complete freeze cycle when Float
     Switch circuit opens.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
IMPORTANT
1.  Board never accepts defrost completion signal
     within the first 2 minutes in defrost cycle.
2.  Defrost cycle time is limited to 20 minutes even if
     Defrost Timer does not stop counting.
4.  Defrost Timer stops counting.
     Defrost cycle is completed and freeze cycle
     starts.
 IMPORTANT
Water Valve opening is
limited to 6 minutes.