Kobe Range Hoods CH0030SQB 사용자 설명서

다운로드
페이지 28
 
 8 
STAND ALONE INSTALLATION 
 
 
***This  installation  only  applied  with  the 
purchase of an optional duct cover: 
 
Preparation before Installation 
 
NOTE:    TO  AVOID  DAMAGE  TO  YOUR 
HOOD,  PREVENT  DEBRIS  FROM 
ENTERING THE   VENT OPENING. 
 
 
Decide the location of the venting pipe 
from the hood to the outside.  Refer to 
Figure 8. 
 
A straight, short venting run  will allow 
the hood to perform more efficiently. 
 
Try  to  avoid  as  many  transitions, 
elbows, and long run as possible.  This 
may  reduce  the  performance  of  the 
hood. 
 
Use  duct  tape  to  seal  the  joints 
between pipe sections. 
 
If necessary, prepare back wall frame 
with  cross  framing  lumber  for  secure 
installation. 
 
Using  references  on  Table  2  and 
measurements on page 14-15, decide 
the  level  of  the  lumber.    Refer  to 
Figure 9.   
 
Hood Preparation before Installation 
 
 
Temporarily  wire  the  hood  to  test  for 
proper operation before installing. 
 
Important:    Peel  protective  film  off 
the hood and the duct cover (if any). 
 
Attach 
the 
two 
hood-mounting 
brackets to the back of the hood with 
(3/16”  x  3/8”)  screws  (provided)  as 
shown In Figure 10. 
 
Hood Installation 
 
CAUTION:  If required to move the cooking 
range  to  install  the  hood,  turn  off  the 
power  on  an  electric  range  at  the  main 
electrical  box.    SHUT  OFF  THE  GAS 
BEFORE MOVING A GAS RANGE. 
 
1. 
Using  references  on  Table  2  and 
measurements on page 14-15, mark the 
leveling point of the hood.  Position two 
mounting  screws  (not  provided)  on  the 
wall, leaving 1/8” away from the wall as 
shown in Figure 11.   
 
Figure 8 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 9 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 10 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 11