Kobe Range Hoods CH0036SQB (36") 사용자 설명서

다운로드
페이지 36
11 
Duct Cover Installation 
 
5.  Use 8” round steel pipe (follow building codes in 
your  area)  to  connect  the  ducting  transition  on 
the hood to the ductwork above.  
Use duct tape 
to  make  all  joints  secure  and  air  tight.
  Refer 
Figure 15.  Slide the duct cover onto the hood.  
6.  Use 3/16” x 3/8” screws  (included) to attach duct 
cover to hood. 
 
 
 
 
 
 
 
 
 
 
 
 
                            Figure 15 
 
Final Assembly 
CAUTION
:  Install heating lamps last. 
 
7.  Drop  oil  tunnel  into  recess  support  near  rear  of 
hood.  Refer to Figure 16. 
8.  Install  baffle  filters  and  stainless  spacer(s).  
Refer  to  Measurements  and  Diagrams  on  page 
21 for baffle filter and stainless spacer placement.  
Angle baffle filter toward back of hood 
.  Push 
baffle filter up until almost level 
.  Slide forward 
into  recess  behind  the  front  of  hood 
.    Lower 
baffle filter 
.  Slide back until it fits into resting 
position 
.Angle baffle filter toward back of hood 
.  Refer to Figure 17. 
9.  Repeat for all baffle filters and spacers. 
10.  Install  heating  lamps  (not  included),  120  Volts 
175 Watts max. each. 
11.  Turn  power  ON  in  control  panel.  Check  all 
lights and fan operation. 
12.  Make  sure  to  leave  this  manual  for  the 
homeowner. 
 
 
           
 
 
                           Figure 16 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                         Figure 17