Kobe Range Hoods CH2736SQB 사용자 설명서

다운로드
페이지 102
7
UNDER THE CABINET INSTALLATION – TOP VENT
Preparation before Installation
NOTE:  TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE 
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside.  Refer to Figure 1.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible.  This may reduce 
the performance of the hood.
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood (if any). 
- For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler 
strips (not included) on each side.  Refer to Figure 2.
- Measure and create access opening for electrical wires under the cabinet.
- Cut the multi duct exhaust according to the size of the venting pipe.  Refer to Figure 3.
                                   Figure 1                                                        Figure 2
                                                                                                                              Figure 3
         
     
     
               6
" Round Vent                       7" Round Vent                 3-1/4" x 10" Vent
Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an 
electric range at the main electrical box.  SHUT OFF THE GAS BEFORE MOVING A GAS 
RANGE.
1.
Puncture the knockout holes on the hood as shown in Figure 4.