Vermont Casting BHDT36 사용자 설명서

다운로드
페이지 34
- 29 -
• GAS SUPPLY ON
• SUPPLY LINE HOOKED UP
• SHUTOFF VALVE OPEN
NO
NO
NO
NO
• LOCKOUT HAS ENGAGED. WAIT 
  60 SECONDS AND TRY AGAIN.
• FOR SPARK AT ELECTRODE 
  WHILE DEPRESSING PIEZO 
  — 1/8" GAP TO 
  PILOT HOOD NEEDED.
• ALL WIRING CONNECTIONS
• REPLACE PIEZO IGNITOR
• FOR AIR IN THE LINES
• THERMOPILE NEEDS A 
  MINIMUM 325mV. ADJUST 
  PILOT FLAME HEIGHT.
• ALL WIRING CONNECTIONS.
• REPLACE THERMOPILE
• THERMOCOUPLE NEEDS A 
  MINIMUM OF 14mV.
• DEFECTIVE VALVE. TURN TO 
  PILOT, METER SHOULD READ 
  GREATER THAN 100 mV. IF 
  NOT, REPLACE. 
PILOT LIGHTS WITH 
PIEZO IGNITOR
YES
YES
YES
YES
PILOT STAYS LIT
PILOT LIGHTS MAIN 
BURNER
SYSTEM OK.
START
CHECK
• VALVE IS TURNED ON
• ON/OFF SWITCH IS NOT
  TURNED ON. WATCH 
  FOR GROUNDED WIRES!
• THERMOPILE NEEDS A 
  MINIMUM 325mV.
• PLUGGED BURNER ORIFICE.
TROUBLE SHOOTING  THE GAS CONTROL SYSTEM
HONEYWELL MILLIVOLT VALVE