AEG PV.630 사용자 설명서

다운로드
페이지 128
Protect PV.630 Maintenance and Servicing 
 
80000047962 BAL 
5 of 14 
4 Maintenance 
and 
Repair 
4.1 General 
Information 
The installed AEG Power Solutions system contains high-quality, 
durable parts and components, which are coordinated with one 
another in order to provide the best possible conditions for system 
operation. To maintain the functional reliability of the system and to 
make sure it continues to deliver optimum energy yields, the fol-
lowing steps need to be performed on a regular basis: 
  Regular inspection of system operation 
  Annual system maintenance 
  Servicing according to the duration of operation 
 Observe the applicable country-specific standards and direc-
tives. 
 
The operator or their designated representative is respon-
sible for the system whilst maintenance work is being car-
ried out; he or she also coordinates the work itself. 
The person appointed to maintain the system is responsi-
ble for the work carried out on the system section as-
signed to him or her. 
 
 
 
Contact with voltage! Extremely high DC voltages of 
up to 1000 VDC are present. 
Risk to life due to electric shock. 
  Do not touch live parts. 
  Wear personal protective equipment. 
 
4.2 
Scope of the Recommended Measures 
We recommend carrying out the following work: 
 
Task  Interval 
Inspection 
1 - 3 months, depending on installation site 
Function test 
6 months 
Maintenance 12 
months 
Servicing 
According to number of operating hours worked 
 
DANGER