Commissioning
 
Functional Test 
         
 
Pre-startup Procedures 
1.  Ensure all DC and AC overcurrent devices are opened or turned off. 
2.  Double-check all wiring connections.   
3.  Inspect the work area to ensure tools or debris have not been left inside. 
4.  Verify battery voltage using a digital voltmeter (DVM).  Confirm the voltage is correct for the 
inverter model.  Confirm the polarity.  
5.  Connect the system display (if present). 
 
 
Startup 
 
Figure 3 
AC Wiring Compartment 
 
 
CAUTION:  Equipment Damage 
Incorrect battery polarity will damage the inverter.  Excessive battery voltage also may damage 
the inverter.  This damage is not covered by the warranty. 
Continued on the next page... 
If steps are inapplicable, they can be omitted.  However, it is highly 
recommended that all applicable steps be performed as below. 
If the results of a step do not match the description, see the 
Troubleshooting section on page 31. 
To start the system: 
1.  Close the main DC circuit breaker (or connect the fuse) from the
battery bank to the inverter.  Repeat for every inverter present. 
2.  Observe the LEDs in the AC wiring compartment.  One of the 
three BATTERY LEDs should be illuminated — green, yellow, or 
red.  Any of them are acceptable at this stage.  (See page 11 for 
a description of the LEDs.)  The INVERTER LED (green) may 
come on at this time.  The fan will run briefly and the relay will 
click as a self-test. 
3.  The ERROR LED may flash briefly.  If it remains illuminated or 
continues to flash during any step, proceed immediately to 
page 31 for troubleshooting. 
4.  Confirm that the system display is operational.  (See the system 
display manual for a description of the menu items that appear 
on a correctly functioning display.)