Avaya 555-231-743 사용자 설명서
GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations
Technician Handbook for Hospitality Installations
555-231-743
Issue 1
November 2000
Installing the System
9
Unpacking the Equipment
Unpacking the Equipment
!
CAUTION:
Lifting and moving the switch cabinets may require two people. The average
weight of a CMC is 50 pounds (23 kilograms); an SCC is 125 pounds (60
kilograms); and the MCC is 800 pounds (268 kilograms). Use caution to
avoid injury.
weight of a CMC is 50 pounds (23 kilograms); an SCC is 125 pounds (60
kilograms); and the MCC is 800 pounds (268 kilograms). Use caution to
avoid injury.
See Chapter 1 in the DEFINITY ECS installation documents and Chapter 2 in the
INTUITY installation documents for more information about the tasks in this
section.
INTUITY installation documents for more information about the tasks in this
section.
1.
Unpack the equipment.
2.
Inspect the equipment for any damage. Report any damages according to
local procedures.
local procedures.
3.
Ensure that all circuit packs are fully inserted into the proper slots
according to the Customer Service Document (CSD). Report any
discrepancies to your Avaya representative or authorized dealer.
according to the Customer Service Document (CSD). Report any
discrepancies to your Avaya representative or authorized dealer.
Installing and Connecting the
Equipment
Equipment
See the appropriate installation document for information about installing and
connecting the equipment:
connecting the equipment:
■
For CMC installations, see Chapter 1 of
DEFINITY ECS Installation,
Upgrades and Additions for Compact Modular Cabinets.
■
For SCC installations, see Chapter 1 of
DEFINITY ECS Installation and
Test for Single-Carrier Cabinets.
■
For MCC installations, see Chapter 1 of
DEFINITY ECS Installation and
Test for Multi-Carrier Cabinets.
■
For installations with an INTUITY system, see Chapters 2 through 4 in the
INTUITY installation documents.
INTUITY installation documents.