Installation & Operation Manual
2  
Prepare boiler 
(continued)
FASTENERS 
APPROPRIATE
FOR WALL TYPE
QTY: 4
MOUNTING BRACKET
(FACTORY SUPPLIED)
WALL:
WOOD OR METAL STUDS ON 
16" CENTERS -OR-
MASONRY / POURED CONCRETE
Figure 2-4 Mounting the Boiler
VENTURI
GAS VALVE
GROMMET
BRASS ORIFICE
SCREWS
Figure 2-3 Installing Propane Orifice 
13.  Reattach the Molex plug to the gas valve.
14.  Models 55 - 285 only, turn the gas valve power switch to 
the “ON” position.  
15.  Model 399 only, turn on power at the source.
16.  After the installation is complete, fill out the gas conversion 
label (in the conversion kit bag) and affix it to the unit 
under the boiler rating plate inside the unit.  Attach the 
LP caution label (in the conversion kit bag) to the left side 
of the unit in the lower left corner.
17.  Replace the front access cover.
2.  Mount the wall bracket using the 2 1/4" lag bolts 
 
provided.  Make sure the top edge of the bracket is away 
 
from the wall.  Ensure the bracket is level when mounted.  
 
Extreme care is needed to ensure the bolts are secured in 
 
the center of the studs.
3.  Hang the boiler on the bracket and secure the bottom of 
 
the boiler with two (2) additional lag bolts provided.
Mounting to a metal studded wall:
1.  The wall mount bracket is designed for a stud spacing of 
 
16 inches from center.  For other stud spacing a solid 
 
mounting surface must be provided by the installer.
 WARNING The boiler is too heavy for a single person 
to lift.  A minimum of two people is needed 
for mounting the boiler onto the bracket.
2.  Mount the wall bracket using two (2) field supplied toggle 
 
bolts capable of supporting 100 pounds each.  Ensure the 
 
top edge of the bracket is away from the wall.  Ensure the 
 
bracket is level when mounted.  Extreme care is needed to 
 
ensure the bolts are secured in the center of the studs.
3.  Hang the boiler on the bracket and secure the bottom of the 
 
boiler with two (2) field supplied toggle bolts.
 WARNING
Do not mount the boiler to a hollow wall.  Be 
sure to mount the boiler to the studs only.
Mounting the boiler
See page 9 of this manual for boiler mounting location 
instructions.
 NOTICE
The Knight Wall Mount boiler is not 
intended for floor installation.
Mounting to a wood studded wall:
1.  The wall mount bracket is designed for a stud spacing of 
 
16 inches from center.  For other stud spacing a solid 
 
mounting surface must be provided by the installer.
 WARNING Do not mount the boiler to a hollow wall.  
Be sure to mount the boiler to the studs 
only.
Mounting to a concrete wall:
1.  Mount the wall bracket using the two (2) wedge anchor 
 
bolts provided with the bracket.  To mount the wedge 
 
anchor bolts, drill a 1/4" diameter hole 1 1/8" deep and 
 
insert anchor.  Hang the bracket from the anchor and secure 
 
with the two nuts provided.  Make sure the top edge of the 
 
bracket is away from the wall.  Ensure bracket is level when 
 
mounted.  Extreme care is needed to ensure the bolts are 
 
secured in the center of the studs.
Note:  If wall thickness does not allow a 1 1/8" deep hole, 
field supplied hardware suitable for the application should be 
provided.
2.  Hang the boiler on the bracket and secure the bottom of the 
 
boiler with two (2) remaining anchors, following the 
 instructions 
above.
 WARNING
The boiler is too heavy for a single person to 
lift.  A minimum of two people is needed for 
mounting the boiler onto the bracket.
 WARNING
After converting to LP, check combustion 
per the Start-up procedure in Section 10 
of this manual.  Failure to check and 
verify combustion could result in severe 
personal injury, death, or substantial 
property damage.
 WARNING The boiler is too heavy for a single person to 
lift.  A minimum of two people is needed for 
mounting the boiler onto the bracket.