 8
FIG. n°3  - Package description
c)
b)
a)
d)
e)
f)
g)
h)
CHAP.3  - THE ARRIVAL OF THE MACHINE
3.1  - DESPATCH OF THE MACHINE   (see FIG. n°3)
The GRILLERS and the TOASTERS  are accurately packed and then despatched
from our warehouse.
The package of the grillers includes:
a) a strong cardbox + inside protections;
b) the machine;
c) this manual;
d) scraper or brush (f) in accordance with the model;
e) EC conformity declaration;
The package of the toasters includes:
a) a strong cardbox + inside protections;
b) the machine;
c) this manual;
e) EC conformity declaration;
g) the pliers;
h) the protective grids.
 9
3.2  - PACKAGE CHECK UPON RECEIPT
If no external damage is evident on the package upon its arrival, open it and check
that all the components are inside (see FIG. n°3). If the package has suffered
rough handling, bumps or crashes, the carrier must be informed about any
damage; moreover a detailed report on the extent of the damage caused to the
machine must be filled within three days from the delivery date shown in the
shipping documents.. Do not overturn the package!! When the package is
transported, make sure the  box is lifted by the 4 corners (parallel to the ground).
3.3  - PACKAGING DISPOSAL
The components of the packaging (cardboard, eventual pallets,  plastic straps and
polyurethane) are urban solid waste; therefore they can be easily disposed.
If the machine has to be installed in countries where specific regulations are in
force, packaging must be disposed in compliance with them.
CHAP. 4   - INSTALLATION
4.1  - SETTING UP OF THE MACHINE
The machine must be installed on a working table suitable for its overall
dimensions shown in  Tab. 1-2, therefore it must be adequately large, well
levelled, dry, smooth, resistant, stable and placed at a height of 80 cm from the
ground.
Moreover the machine must be installed in a room with  max. 75% not saline
humidity at a temperature between +5°C and +35°C; that is to say in a place that
does not provoke the machine failure.
4.2  - ELECTRICAL CONNECTIONS
The machine is equipped with a power supply cord which section is adequate to
the absorb power and  a plug.
To connect the machine, follow the indication of the rating plate - serial number
(see FIG. n°4).
Check that the earthing is fully operational.
Moreover check that the features on the rating plate - serial number (see FIG. n°4)
correspond to the features shown in the consignment and delivery note, and that
the  disconnecting plug and the socket are easy to reach when the machine is
functioning.
FIG.n°4 Rating plate-serial number