Panasonic DBS 576 부록 매뉴얼
Section 700 - Operation
Chapter 7. SLT Features
576-50-700
DBS 576HD (USA) issued September 2001
3-47
Non-Blocking Architecture
Description
The System is totally non-blocking. All extension and outside lines are available for use at the same
time.
Hardware Requirements
•
The CPC-HS supports 64 (max. 28 extensions). The CPC-HM supports up to 116 ports (max. 60
extensions).
Related Programming
•
N/A
Considerations
•
N/A
Power On Maintenance
Description
The System allows you to change most circuit cards, programming, and many other maintenance
features while the System is powered on and operating. Very few operations require the System to be
powered down or out of service. The System therefore continues to operate without interruption for
most maintenance functions.
A limited number of items such as the replacement of some common control circuit cards requires the
system to be powered down.
Hardware Requirements
•
N/A
Related Programming
•
N/A
Considerations
•
N/A
Programming Devices
Description
The dealer may program the System either by using:
•
A digital key telephone equipped with display.
•
DBS 576 Manager.