GE 25865 사용자 가이드

다운로드
페이지 108
11
Installing the Base Station
Installing the Backup Batteries on Base Unit
To avoid power outage, you can install four AA alkaline batteries (not included in sales) 
into the base as the backup.
1.  Remove the battery compartment cover (located on the bottom of the base).
.  Follow the battery installation display and insert four AA alkaline batteries inside the 
compartment.
3.  Put the battery compartment cover back into place.
Connecting the Base Station
1.  Choose an area near an electrical outlet and a telephone wall jack (either two RJ11 
or one RJ14 type), and place  your cordless telephone on a level surface, such as a 
desktop or tabletop, or you may mount it on the wall.
.   Plug the AC power converter into the electrical outlet and the DC connector into the 
jack on the back of the base. 
3.  Plug one end of a telephone line cord into the TEL LINE 1 jack on the back of the base 
and the other end into the modular wall jack for Line 1. Plug the other telephone line 
cord into the TEL LINE  jack on the back of the base and the other end into modular 
wall jack for Line .
NOTE: If you have only one wall jack for the both lines, use the TEL LINE 
1/L1 + L2 jack on the back of base. 
4.   Place the handset in the base cradle. The charge/in use indicator turns on, verifying the 
battery is charging.  
HANDSET 1 shows in the handset’s display after approximately  
minutes.
5.  Allow the phone to 
charge for 16 hours prior to first use. If you don’t properly charge 
the phone, battery performance is compromised. 
CAUTION: Use only the 5-2605 power adaptor that came with this 
unit. Using other power adaptors may damage the unit.
Wall Mounting the Base
1.  Turn the base over. 
.  Slide the pedestal into the slots on the bottom of the base, and then push the pedestal 
down until it snaps into place.
3.  Slip the mounting holes on the pedestal over the wall plate posts and firmly slide the 
unit into place. (Wall plate not included.)