D-Link DFL-1600 참조 가이드
Log Message
PPP negotiation completed for session <callid> to <remotegw> on
<iface>. User: <user>, Auth: <auth>, MPPE: <mppe>, Assigned IP:
<assigned_ip>
<iface>. User: <user>, Auth: <auth>, MPPE: <mppe>, Assigned IP:
<assigned_ip>
Explanation
The PPP negotiation has completed successfully for this session. The
specified interface, remote gateway and call ID identify the specific
session.
specified interface, remote gateway and call ID identify the specific
session.
Gateway Action
None
Recommended Action
None.
Revision
1
Parameters
callid
iface
remotegw
user
auth
mppe
assigned_ip
iface
remotegw
user
auth
mppe
assigned_ip
2.32.13. pptp_session_up (ID: 02700013)
Default Severity
Log Message
PPP negotiation completed for session <callid> on <iface> connected
to <remotegw>. Auth: <auth>, MPPE: <mppe>
to <remotegw>. Auth: <auth>, MPPE: <mppe>
Explanation
The PPP negotiation has completed successfully for this session. The
specified interface, remote gateway and call ID identify the specific
session.
specified interface, remote gateway and call ID identify the specific
session.
Gateway Action
None
Recommended Action
None.
Revision
1
Parameters
callid
iface
remotegw
auth
mppe
iface
remotegw
auth
mppe
2.32.14. tunnel_idle_timeout (ID: 02700014)
Default Severity
Log Message
PPTP tunnel to <remotegw> on <iface> has been idle for too long.
Closing it.
Closing it.
Explanation
A PPTP tunnel has been idle for too long. Tunnel will be closed.
Gateway Action
close_tunnel
Recommended Action
None.
Revision
1
2.32.13. pptp_session_up (ID:
02700013)
02700013)
Chapter 2. Log Message Reference
372