Netgear M5300-52G-POE+ (GSM7252PSv1h2) - ProSAFE 48+4 L2+ POE Stackable Managed Switch 관리자 가이드
356
|
Chapter 19. Switch Stacks
ProSafe Managed Switch
Move the Stack Master to a Different Unit
This example is provided as CLI commands and a Web interface procedure.
CLI: Move the Stack Master to a Different Unit
1.
Using the movemanagement command, move the master to a different unit number. The
operation takes between 30 seconds and 3 minutes depending on the stack size and
configuration. The command is movemanagement <fromunit-id> <tounit-id>.
operation takes between 30 seconds and 3 minutes depending on the stack size and
configuration. The command is movemanagement <fromunit-id> <tounit-id>.
2.
Make sure that you can log in on the console attached to the new master. Use the show
switch
switch
command to verify that all units rejoined the stack.
3.
NETGEAR recommends that you rest the stack with the reload command after moving the
master.
master.
Web Interface: Move the Stack Master to a Different Unit
1.
Select System > Management > Basic > Stack Configuration. A screen similar to the
following displays.
following displays.
2.
In the Management Unit Selected list, select 2.
A warning window displays.
3.
Click the OK button.
4.
Click Apply.
Note:
If you move a master to a different unit, you might lose the
connection to the switch because the IP address could change if the
switch gets its IP address using DHCP.
switch gets its IP address using DHCP.