Netgear M5300-52G-POE+ (GSM7252PSv1h2) - ProSAFE 48+4 L2+ POE Stackable Managed Switch 관리자 가이드
Chapter 19. Switch Stacks
|
359
ProSafe Managed Switch
CLI: Change the SDM template on the M5300 switch to match
the one on the GSM7328Sv2 switch.:
the one on the GSM7328Sv2 switch.:
After the command is issued, check the SDM template setting on the M5300 switch to make
sure it is now set to 'dual ipv4 and ipv6 smb'. When the M5300-28G3 switch is verified
to have the correct SDM template, you can connect the M5300-28G3 and GSM7328Sv2
switches together to form the stack.
sure it is now set to 'dual ipv4 and ipv6 smb'. When the M5300-28G3 switch is verified
to have the correct SDM template, you can connect the M5300-28G3 and GSM7328Sv2
switches together to form the stack.
Web Interface: Change the SDM template on the M5300
switch to match the one on the GSM7328Sv2 switch.
switch to match the one on the GSM7328Sv2 switch.
1.
Select System > Management > SDM Template Preference
2.
Select Default from the drop-down menu next to SDM Next Template ID field.
3.
Click Apply.
(M5300) (Config)#sdm prefer ipv4-routing smb