Netgear M5300-52G-POE+ (GSM7252PSv1h2) - ProSAFE 48+4 L2+ POE Stackable Managed Switch 관리자 가이드
![Netgear](https://files.manualsbrain.com/attachments/cf1ad5de25a3f8d6c88ef0ab489c1b137eebe11f/common/fit/150/50/17742d1e0cdacf24edeb88c30757620088415c5f7699f69b4517262e21e0/brand_logo.jpeg)
58
|
Chapter 3. LAG s
ProSafe Managed Switch
Enable Both LAGs
The example is shown as CLI commands and as a Web interface procedure.
CLI: Enable Both LAGs
By default, the system enables link trap notification.
At this point, the LAGs could be added to VLANs.
Web Interface: Enable Both LAGs
a. Select Switching > LAG > LAG Configuration. A screen similar to the following
displays.
b. Select the top check box and the check boxes for lag_10 and lag_20 are selected.
c. In the Admin Mode field, select Enable.
d. Click Apply to save the settings.
(Console) #config
(Console) (Config)#port-channel adminmode all
(Console) (Config)#exit