Cisco Cisco ONS 15454 SONET Multiservice Provisioning Platform (MSPP) 설치 가이드
2
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
78-13271-05
Safety Recommendations
Safety Recommendations
The following guidelines will help to ensure your safety and protect the equipment. This list does not
include every potentially hazardous situation.
include every potentially hazardous situation.
•
Never attempt to lift an object that might be too heavy for you to lift by yourself.
•
Always disconnect the power source and unplug all power cables before installing or removing the
Bay Assembly.
Bay Assembly.
•
Carefully examine your work area for possible hazards such as moist floors, ungrounded power
extension cables, and missing power grounds.
extension cables, and missing power grounds.
•
When using equipment such as a safety hand truck, pallet jack, or forklift to move the Bay Assembly
to another location, use only moving equipment that is capable of preventing the Bay Assembly from
tipping.
to another location, use only moving equipment that is capable of preventing the Bay Assembly from
tipping.
•
Do not wear loose clothing, jewelry (including rings and chains), or other items that could get caught
in the Bay Assembly.
in the Bay Assembly.
•
Do not work alone if potentially hazardous conditions exist.
Recommended Materials
Because most of the installation is complete when you receive the system, the Bay Assembly requires
little installation material. The most significant tasks are removing the packaging from the Bay
Assembly and removing the Bay Assembly from the shipping pallet. Because the actual installation of
the Bay Assembly in each facility is done according to local site practice, your material needs may vary.
little installation material. The most significant tasks are removing the packaging from the Bay
Assembly and removing the Bay Assembly from the shipping pallet. Because the actual installation of
the Bay Assembly in each facility is done according to local site practice, your material needs may vary.
Cisco recommends that you have the following items on hand for installation:
•
A pallet jack to move the packaged Bay Assembly to the unpacking/staging area
•
A pair of scissors to cut the plastic banding on the shipping container
•
A safety hand truck with retractable safety leg wheels and a safety strap
•
Utility blankets or their equivalent to protect the Bay Assembly while on the hand truck
•
Phillips screw driver or cordless drill with Phillips bit
•
3/4 in. (19 mm) socket or box-end wrench for the earthquake floor bolts
•
that can be ordered separately