Cisco Cisco Process Orchestrator 3.0 설치 가이드
4-6
Cisco Process Orchestrator Installation Guide
OL-24931-02
Chapter 4 Configuring a High Availability Environment
Balancing Client Connection Loads
Step 5
To ensure that load balancing is running successfully, you can either:
•
Select a specific host and Stop or Drainstop connections to that host.
-or-
•
Disable the network interface or bring down the server that the Process Orchestrator is running on.
In a production environment, you should be monitoring specific NBWS ports (by default 61526 or
61527), server port (61525), or IIS port (2081) and can test just by bringing down these applications or
services.
61527), server port (61525), or IIS port (2081) and can test just by bringing down these applications or
services.