Cisco Cisco UCS B250 M2 Extended Memory Blade Server 정보 가이드
Product End-of-Life Notice
© 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public.
Page 1 of 2
End-of-Sale and End-of-Life Announcement for the
Select Cisco UCS B250 M2 Distribution Bundles
EOL8386
Cisco announces the end-of-sale and end-of life dates for the Select Cisco UCS B250
M2 Distribution Bundles. The last day to order the affected product(s) is August 29,
2012. Customers with active service contracts will continue to receive support from
the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin.
Table 1 describes the end-of-life milestones, definitions, and dates for the affected
product(s). Table 2 lists the product part numbers affected by this announcement. For
customers with active and paid service and support contracts, support will be available
until the termination date of the contract, even if this date exceeds the Last Date of
Support shown in Table 1.
M2 Distribution Bundles. The last day to order the affected product(s) is August 29,
2012. Customers with active service contracts will continue to receive support from
the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin.
Table 1 describes the end-of-life milestones, definitions, and dates for the affected
product(s). Table 2 lists the product part numbers affected by this announcement. For
customers with active and paid service and support contracts, support will be available
until the termination date of the contract, even if this date exceeds the Last Date of
Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Select Cisco UCS B250 M2 Distribution Bundles
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a product is
distributed to the general public.
distributed to the general public.
May 30, 2012
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is
no longer for sale after this date.
no longer for sale after this date.
August 29, 2012
Last Ship Date:
HW
HW
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
manufacturers. Actual ship date is dependent on lead time.
November 27, 2012
End of Routine Failure
Analysis Date:
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to determine the cause
of hardware product failure or defect.
of hardware product failure or defect.
August 29, 2013
End of New Service
Attachment Date:
Attachment Date:
HW
For equipment and software that is not covered by a service-and-support contract, this is
the last date to order a new service-and-support contract or add the equipment and/or
the last date to order a new service-and-support contract or add the equipment and/or
software to an existing service-and-support contract.
August 29, 2013
End of Service Contract
Renewal Date:
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
November 24, 2016
Last Date of Support:
HW
HW
The last date to receive service and support for the product. After this date, all support
services for the product are unavailable, and the product becomes obsolete.
services for the product are unavailable, and the product becomes obsolete.
August 31, 2017
HW = Hardware
OS SW = Operating System Software App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
UCSB-DBUN-B250-104
Disti: UCS B250 M2 Blade, 2xX5675, 2x16GB Kit, w/o HDD mez
UCSB-DBUN-B250-105
Disti: UCS B250 M2 Blade, 2xX5690, 2x16GB Kit, w/o HDD mez