Cisco Cisco StadiumVision Mobile 설치 가이드
© 2011 Cisco Systems, Inc. All rights reserved
Page 15 of 71
b. Select the language in which you would like to read the document.
c. Click Go. The Cisco warranty page appears.
d. Review the document online, or click the PDF icon to download and print
the document in PDF.
Duration of Hardware Warranty
Ninety (90) days.
Required Tools and Equipment
Caution! The fastener pack, within the rack-mount kit, contains eight rack
screws. You must check these screws to ensure that they are the appropriate
size for the holes in your rack. Using the wrong-sized screws for your threaded
rack holes can damage the rack.
screws. You must check these screws to ensure that they are the appropriate
size for the holes in your rack. Using the wrong-sized screws for your threaded
rack holes can damage the rack.
You need the following tools and equipment to install the SV Director Server in a
4-post rack:
4-post rack:
Warning! Only trained and qualified personnel should be allowed to install,
replace, or service this equipment. Statement 1030
replace, or service this equipment. Statement 1030
ESD-preventive cord and wrist strap.
Number 2 Phillips screwdriver.
Flat-blade screwdrivers: small, 3/16-inch (0.476 cm) and medium, 1/4-inch
(0.625 cm) to remove the cover, if you are upgrading memory or other
components.
components.
4-Post Rack-Mount Hardware Kit (included)
Cables for connection to the LAN ports (depending on the configuration).
Ethernet hub or PC with a network interface card for connection to the
Ethernet (LAN) port or ports.
Console terminal (an ASCII terminal or a PC running terminal-emulation
software) that is configured for 9600 baud, 8 data bits, no parity, 1 stop bit,
and no hardware flow control.
and no hardware flow control.
Console cable for connection to the serial (console) port.
Installation Checklist
To assist you with your installation and to provide a historical record of what was
done, and by whom, use the following Installation Checklist. Make a copy of this
checklist and mark the entries as you complete each task.
done, and by whom, use the following Installation Checklist. Make a copy of this
checklist and mark the entries as you complete each task.