Patton electronic smartnode 4110 사용자 설명서

다운로드
페이지 66
3 • Installation
Model 4520 & 4110 Series Getting Started Guide
32
Planning the installation
Planning the installation
Before you start the actual installation, it is strongly recommended that you gather all the information needed 
to install and setup the device. See 
 for an example of what pre-installment checks you might need to 
carry out. Having carried out the pre-installation checks enables you to install and set up your gateway router 
into an existing infrastructure with confidence.
Note
When setting up your gateway router consider cable length limitations, and 
potential electromagnetic interference (EMI) as defined by the applicable 
local and international regulations. Ensure that your site is properly prepared 
before beginning installation.
Before installing the gateway router device, the following tasks should be completed:
Create a network diagram (see section 
Gather IP related information (see section 
 on page 34 for more information)
Install the hardware and software needed to configure the SmartNode. (See section 
Verify power source reliability (see section 
When you finish preparing for gateway router installation, go to section