Using the Mounting Template
The mounting template (see insert) is designed to simplify mounting the operator.  It provides the installer with the
proper locations for running power and accessory wiring conduits.  The template is also marked with the correct
distance between the operator mounting holes and shows the installer how to position the operator for the correct
clearance between the housing and the gate.
NOTE: The operator must be securely mounted on a level concrete pad.  If you do not have an existing pad to work
with, be sure to install wiring conduit before pouring concrete.  You must use (4) 
1
/
2
” diameter mounting anchors,
washers, and nuts (not included) to mount the operator on the pad.
Study the mounting template.  Lay the mounting template on the level concrete pad and mark the pad according to the
instructions on the template.
Before mounting the operator, check the following:
•     The concrete pad is level.
•     Four (4) 
1
/
2
” diameter mounting anchors are in their correct positions.
•     Conduit for power and accessory wiring is installed.
Roller
Gate
Fence Post
Fence Post
Roller
 C
L
Driveway
Safety Edges
(REQUIRED)
Safety   Edge
(REQUIRED)
Safety   Edge
(REQUIRED)
4" to 6"
Installation Alignment
Chain Bracket
Pad mounting holes line up with 
chain idler wheels and should be 
no closer than 4 inches and no 
futher than 6 inches from the gate.
Operator must be mounted with 
the chain rollers and sprocket 
aligned with the chain.
Chain brackets must be installed (welded 
or bolted) to provide 4 to 6 inches between 
chain and inside of gate. This will insure 
adequate clearance between the operator 
housing and the gate.
18
11
/
16
"
center to center mounting holes
7"
center to center
mounting holes
Use 1/2" dia. concrete mounting bolts in mounting pad.