Hitachi L100 사용자 설명서

다운로드
페이지 192
L100 Inverter
In
v
e
rt
er Mounting
and Installation
2–3
2. Second-level access - Locate the lift tab at the right lower corner of the front panel 
near the safety warning message. Lift the corner to swing the half-door around to the 
left. This exposes four more control buttons and some connectors.
The FUNC., 
, and STR keys allow an operator to access and change the 
inverter’s functions and parameter values. The 7 and 8-position connectors provide 
the interface for logic-level control signals. These signals are generally low-voltage 
in nature and are appropriate for second-level access.
Locate the label sheet that came with the manual. This is a good moment to apply the 
self-sticking labels as shown below. Adhere the larger label for monitor codes and 
basic functions to the rear of the half-door panel. Then adhere the remaining trip code 
label to the area beside the connectors. Be careful not to cover the screw access on 
models like the one shown. 
1
2
Control signal 
connectors
Lift tab for 
opening door
Controls for mode 
and parameter 
changes