Hitachi L100 사용자 설명서

다운로드
페이지 192
Step-by-Step Basic Installation
In
v
e
rt
er Mounting
and Installation
2–8
Ensure Adequate Ventilation
Step 2: To summarize the caution messages—you will need to find a solid, non-flamma-
ble, vertical surface that is in a relatively clean and dry environment. In order to ensure 
enough room for air circulation around the inverter to aid in cooling, maintain the speci-
fied clearance around the inverter specified in the diagram.
CAUTION: Be sure to maintain the specified clearance area around the inverter and to 
provide adequate ventilation. Otherwise, the inverter may overheat and cause equipment 
damage or fire.
Keep Debris Out of Inverter Vents
Step 3: Before proceeding to the wiring section, it’s 
a good time to temporarily cover the inverter’s 
ventilation openings. Paper and masking tape are 
all that is needed. This will prevent harmful debris 
such as wire clippings and metal shavings from 
entering the inverter during installation. The 
inverter housing comes from the factory with a 
snap-in cover on the top of its housing. Ensure it is 
in place at this time (also to be removed later, 
unless the installation must have a NEMA rating).
Please observe this checklist while mounting the 
inverter:
1. The ambient temperature must be in the range of -10 to 40°C. If the range will be up 
to 50°C, you will need to set the carrier frequency to 2.1 kHz or less and derate the 
output current to 80% or less. Chapter 3 covers how to change parameters such as the 
carrier frequency. Remember to remove the top cover (unless the installation is to 
have a NEMA rating)!
2. Keep any other heat-producing equipment as far away from the inverter as possible.
2
8 cm (3.15”)
 minimum
10 cm (3.94”) 
minimum
12 cm (4.72”)
 minimum
10 cm (3.94”) 
minimum
L100
Clear area
Air flow
3
Top cover 
installed
Ventilation holes
(both sides)