RadioFrame Networks Inc DH2 사용자 설명서
RadioFrame System
Installation
RFN_3.1 Beta
77
8 Holding the ground strap in place, replace each iDEN RadioBlade antenna
one at a time.
9 Insert the 802.11b RAPs, one at a time, into the specified slots in the RFU
until the connector on each RAP seats firmly into the back of the RFU (see
the following illustration).
the following illustration).
10 Remove the antistatic wrist strap and place the front cover on the RFU.
Figure 28
Insert the 802.11b RAPs into the specified slots of the RFU.
4.5 Interconnecting
Cabling
4.5.1 T1
The Telco interface should have been installed according to the Pre-installation
chapter.
chapter.
NOTE: The equipment can be installed and tested without the Telco T1/E1
present. The T1/E1 must be connected for proper operation of the site.
present. The T1/E1 must be connected for proper operation of the site.
NOTE: Some modular cables have a ridge along one side of the cable for
purposes of alignment with the connector.
purposes of alignment with the connector.
NOTE: The SmartJack is capable of passing -48V Telco power through to the
site controller. For operation, iDEN does not require this power. If -48V is present
site controller. For operation, iDEN does not require this power. If -48V is present