Comba Telecom Ltd. RX-7W22 사용자 설명서

다운로드
페이지 40
INSTALLATION GUIDE FOR RX7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 33 
 
 
 
 
Step 2: Click 
 to start the process. 
 
 
Figure 31: Commissioning Procedure 
– Site Info. Setting 
 
 
 
 
 
Step 3: Click
, users can set the site information. 
 
 
 
Figure 32: Dev Info & Date/Time 
 
Dev Info mainly used to record device location and Date/Time provides a time reference. Click the Config 
Value of Date/Time, will update Date/time automatically. 
 
NOTE:  Make  sure  the  device  is  connected  with  appropriate  donor  and  service  antennas  before 
proceeding to step 4. 
 
 
Step 4: Click 
 to enter to Isolation Detection Screen shown as Figure 52. 
 
  Select a frequency band (RFU) that need to commission. 
  Click 
 to start Isolation Detecting, then [Confirm] window will pop-up shown as Figure 
53.