Elster Solutions LLC VRT02 사용자 설명서
CHAPTER
6
VRT
R
EMOTE
G
AS
-
METER
T
RANSPONDER
I
NSTALLATION
VRT Gas Transponder ― User Guide
Page 29
AMCO Automated Systems
•
P/N 52870T010 Rev 1 May 2003
10. Position the index box (with index/pulser assembly) over the
screw holes in the meter flange.
• Ensure that the individual pulser wires are well inside the box
and the insulated section of cable exits via the notch made in
Step 3.
Step 3.
11. If the index box has a back cover, reinstall it now.
• Use the screws removed in Step 1.
12. Mount the index box (and attached index/pulser assembly) to
the meter flange.
• Use the screws removed in Step 1.
13. Reseal all screws with new seals.
14. Mount the transponder to the meter or wall.
• Refer to the applicable transponder mounting procedure
below for specific instructions.
Route the
cable
through the
notch.
Make sure
the end of
the
insulated
covering is
well inside
the box.
cable
through the
notch.
Make sure
the end of
the
insulated
covering is
well inside
the box.
Replace seals
on screws
Replace
seals on
seals on
screws
FRONT
REAR