Codan Radio Communications UT-4-400 사용자 설명서

다운로드
페이지 45
DE
DANIELS
ELECTRONICS
UT-4R400 UHF Project 25 Digital Transmitter Instruction Manual
4-3
separate control of  their channel  select  lines,  so  changing receiver  channels  does  not  affect  the
transmitter channel.
Q: Why is the transmitter staying on after the receiver signal is removed?
A: The transmitter has a hang timer that keeps it keyed after the receiver signal disappears.   This
can be used to keep a chain of repeaters up between transmissions.  The delay is adjustable from 0
to 3.75 seconds.
Q: What’s that noise at the end of a transmission?  
A: The  transmitter  can  insert  an  audible  “kerchunk”  at  the  end  of  a  repeater  transmission.    In
Project 25 digital mode, this simulates the effect of the squelch noise,  which is heard at the end of
an  analog  repeater  transmission.    In  analog  systems,  the  squelch  noise  is  the  sound  of  the
receiver’s IF noise before it squelches.  This is often useful as a confirmation to repeater users  that
they  have  “hit”  the  repeater.    In  Project  25  Digital  mode,  no  noise  is  heard  at  the  end  of  a
transmission due to the all-digital nature of the system,  so  an artificial noise is added to serve the
same  purpose.    There  is  a  jumper  on  the  transmitter’s  microprocessor  board  to  disable  the
kerchunk noise.
Q: Why is the Radio Service Software failing partway through a read or write of the receiver?
A: If the receiver is squelching and unsquelching repeatedly during the read or write operation, the
communications bus may be too congested.  Try changing channels on the receiver, or disconnect
the RF signal source from the receiver during the read or write operation.  
Q: Why does the transmitter not transmit with the correct TGID or NAC, or in the wrong mode?  
A: In a typical repeater, if the received signal is digital, the transmitter will be keyed from a bank B
channel, NOT from  bank  A,  even  though  the  receiver  may  be  receiving  on  a  bank  A  channel.  
Make sure that for each transmit channel number,  both the A  and  B  bank  are  programmed  with
analog information and Project 25 information, respectively.