Embed International Pty Ltd STS101 사용자 설명서
www.embedcard.com
9
Video Game Installation
Standard type Video Games are typically strait forward to install with connections to the 12v DC
Power Supply and Credit Input only. From start to finish you can expect to take 25-35 minutes.
Harness Required
The harness required for this installation is the “Standard Video Harness”.
Harness Connections
Power
– 12 volt DC
Power to the IOC is supplied via the 12-way connector through the following pins:
Pin number
Wire Colour
Wire Function
1
ORANGE
DC +12 v
2
BLACK
DC Ground
Start by locating the
game’s power supply, these are typically located in the base of the cabinet.
Identify and measure the 12v DC output ensure it is stable and ideally between 12-13v DC. Splice
in the Orange wire to +12v DC and the Black wire to DC Ground.
It is important for long term reliability that this this connection is made at, or as close as possible
to the Power Supply and not at a mid-point in the game harness or coin door.
in the Orange wire to +12v DC and the Black wire to DC Ground.
It is important for long term reliability that this this connection is made at, or as close as possible
to the Power Supply and not at a mid-point in the game harness or coin door.
Standard Video Harness
– Part # IOC-005