MAINTENANCE MANUAL
965-1696
MAINTENANCE PRACTICES
1.
Planning Data (TASK 23-20-59-99C-802-A01)
A.
Reason for the Job (Subtask 23-20-59-99C-004-A01)
(1)
This section gives service personnel installation and maintenance information for the RTA-50D
VDR. Installation instructions are supported by mechanical outline drawings and an electrical
interconnection diagram. These drawings must be reviewed by the installer and requirements
unique to the airframe must be established before starting the installation.
(2)
Use these diagrams as an aid to fault isolate the RTA-50D VDR.
B.
Job Setup Data (Subtask 23-20-59-99C-005-A01)
(1)
The list that follows identifies Honeywell publications that are related to this section:
• Not applicable.
2.
Inspection After Unpacking (TASK 23-20-59-000-801-A01)
A.
General (Subtask 23-20-59-000-001-A01)
CAUTION:
THIS EQUIPMENT CONTAINS ELECTROSTATIC DISCHARGE SENSITIVE (ESDS)
DEVICES. EQUIPMENT, MODULES, AND ESDS DEVICES MUST BE HANDLED
WITH APPROPRIATE PRECAUTIONS.
(1)
Visually inspect the RTA-50D VDR and all associated equipment for possible damage which
can have occurred during shipment. Inspect for dents, deep abrasions, chipped paint, etc. If
any equipment is damaged, notify the transportation carrier immediately.
(2)
The Honeywell test, inspection record, and quality report tag is included with each shipped
unit. This informs the customer that the necessary production tests and inspection operations
have been performed on that particular unit.
(3)
One copy of the report tag is affixed to each unit by the first assembly inspector. As the unit
proceeds through production and stock to the shipping area, the appropriate blocks on the
test and inspection record of the tag are stamped. This tag accompanies the unit when it is
shipped to the customer. Customers are requested to complete the Honeywell Airlines and
Avionics Products quality report portion of the tag and return it to the Honeywell Airlines and
Avionics Products Quality Assurance Department. This portion of the tag provides Honeywell
with the necessary information required to evaluate shipping methods as well as test and
inspection effectiveness.
(4)
Completed cards are accumulated to give information for a periodic analysis.
3.
Preinstallation Testing (TASK 23-20-59-000-802-A01)
A.
Overview (Subtask 23-20-59-000-002-A01)
(1)
The components in the RTA-50D VDR have been adjusted and tested before shipment.
Preinstallation testing is not required. However if preinstallation testing of the RTA-50D VDR is
desired, refer to the customer acceptance criteria given in the CMM for the appropriate unit in
the system. Refer to Paragraph 3.A. (Subtask 23-20-59-99F-011-A01) in the INTRODUCTION
(PGBLK 23-20-59-0) section for a list of related CMMs.
EFFECTIVITY
ALL
23-20-59
Page 2001
1 Mar 2011