Invenco Group Ltd G6OPT 사용자 설명서
DCV-00001 Rev 05 S2 G6 OPT Installation Guide
Page 24
7 Removal & Reinstallation
If the G6 OPT needs to be removed from its installation, please follow these steps:
Step
Description
1.
Ensure the terminal is not being used by a customer.
2.
Open the pump/pedestal door.
3
Reverse-feed the paper to extract it from the printer.
Remove the paper roll from the terminal.
Remove the paper roll from the terminal.
4
Switch off the mains power to the power supply.
5
Carefully cut the cable ties holding the cables to the G6 OPT. Any other
cable ties should be left in place.
cable ties should be left in place.
6
Unplug the LAN cable and the low-voltage power cable from the G6 OPT.
Remove the Ground wire.
Remove the Ground wire.
7.
Loosen and remove the screws holding the G6 OPT to the door. There
will be either -
a.
will be either -
a.
12 screws around the outside of the rear plastics if the terminal was
installed new, or
installed new, or
b.
4 screws into a pair of adaptor brackets if it was a retrofit. The
brackets can remain in place unless they cause interference, or if
you need to replace them as well.
brackets can remain in place unless they cause interference, or if
you need to replace them as well.
8.
There is a soft foam gasket that seals the G6 OPT to the outside face of
the door, and over time this is likely to stick to the door.
the door, and over time this is likely to stick to the door.
Use gentle hand pressure to push the G6 OPT off the door, while holding
the terminal on the outside to prevent it falling.
the terminal on the outside to prevent it falling.
9
Place the G6 OPT into suitable packaging for transport or perform the
necessary maintenance.
10.
If the sealing gasket was stuck to the door, clean off any pieces of gasket
material with a soft scraper, being careful not to damage the door surface.
material with a soft scraper, being careful not to damage the door surface.