HQ -R2U-AAA-01 HQ-R2U-AAA-01 사용자 설명서
제품 코드
HQ-R2U-AAA-01
Nickel Battery Business Division
Lithium Battery Business Division
Add:No.11-26 Bldgs, Tongfucun Industrial zone, Shiao,Dalang,
Longhua Town, Bao’an District,Shenzhen , China
Longhua Town, Bao’an District,Shenzhen , China
Add: No.9 Bldg, Hualian Industrial Zone, Huaning
Road,Dalang Street , Bao’an District ,Shenzhen
Road,Dalang Street , Bao’an District ,Shenzhen
Tel:0755-2807 8088(50 Lines) Fax:0755-2807 8588
Tel:0755-3323 9538 Fax:0755-3323 9895
Websites:
Email:
Global Service Hotline:400-0667-800
4. Performance Testing
4.1. TEST CONDITIONS
4.1.1 The battery to be tested is the product within one month after being received by customer.
4.1.2 Ambient conditions:
Temperature +20
±5
℃
℃
Humidity +65%±20%
4.2 Testing Tools
4.2.1 Voltage meter:
0.5 level or higher as required in IEC51/IEC485. Internal impedance exceeds 10KΩ/V.
4.2.2 Current meter:
0.5 level or higher as required in IEC51/IEC485. Internal impedance should be less than
0.01Ω/V(including wires).
0.01Ω/V(including wires).
4-2.3. Micrometer caliper:
With precision of 0.02mm.
4-2.4. Internal impedance meter:
Alternating current of 1000HZ, connector measuring equipment with sin wave of 4.
4-2.5: Impedance loaded meter:
Value of impedance is with +5% error allowed (including external wires).
4.2.6 Incubators Accuracy ±2℃
4.3 Test methods and benchmarks
Item
Test Method
Benchmark
1.Appearance:
² eyeballing
² batteries shall be free from any
stains; scratches or deformations,
which may reduce the commercial
value when visually inspected
which may reduce the commercial
value when visually inspected
2.Size:
² caliper measurement。
² The size shall comply with the
specified size as the attached
drawing
drawing
3.Insulate
impedance
² measured with a Megger overpack and
battery electrode between the degree of
insulation。
insulation。
² outer sleeve shall exceed 10
MΩ。
4.Weight
² using disk-scale measurement。
² approximate 12.5 g。
5.Charge Voltage
² Following a period of discharge at
0.2CmA down to a terminal voltage of
1.0V, standard charge, the cell or battery
shall be checked at 5 minutes before
finish charging。
1.0V, standard charge, the cell or battery
shall be checked at 5 minutes before
finish charging。
² The voltage shall be less than 1.6
V。
6.Open circuit
voltage: (O.C.V.)
voltage: (O.C.V.)
² Following a standard charge period, the
open circuit voltage of the cell or battery
shall be checked within 1 hour.。
shall be checked within 1 hour.。
² The O.C.V. shall exceed 1.25 V
7.Closed circuit
² Following a standard charge period, the
² The C.C.V. shall exceed 1.2 V。