HQ -R2U-AAA-01 HQ-R2U-AAA-01 사용자 설명서

제품 코드
HQ-R2U-AAA-01
다운로드
페이지 8
 
Nickel Battery Business Division 
Lithium Battery Business Division 
Add:No.11-26 Bldgs, Tongfucun Industrial zone, Shiao,Dalang, 
Longhua Town, Bao’an District,Shenzhen , China 
Add: No.9 Bldg, Hualian Industrial Zone, Huaning 
Road,Dalang Street , Bao’an District ,Shenzhen
 
Tel:0755-2807 8088(50 Lines) Fax:0755-2807 8588 
Tel:0755-3323 9538  Fax:0755-3323 9895 
Websites:
 
Email:
Global Service Hotline:400-0667-800 
 
                                            
4. Performance Testing  
4.1. TEST CONDITIONS 
  4.1.1  The battery to be tested is the product within one month after being received by customer.  
4.1.2 Ambient conditions: 
                   Temperature                                +20
±5
℃ 
                    Humidity                                     +65%±20% 
4.2 Testing Tools  
4.2.1 Voltage meter:  
0.5 level or higher as required in IEC51/IEC485. Internal impedance exceeds 10KΩ/V. 
4.2.2 Current meter:  
0.5  level  or  higher  as  required  in  IEC51/IEC485.  Internal  impedance  should  be  less  than 
0.01Ω/V(including wires). 
4-2.3. Micrometer caliper:  
With precision of 0.02mm. 
4-2.4. Internal impedance meter:  
Alternating current of 1000HZ, connector measuring equipment with sin wave of 4. 
4-2.5: Impedance loaded meter:  
Value of impedance is with +5% error allowed (including external wires). 
 4.2.6 Incubators   Accuracy ±2℃ 
 
4.3 Test methods and benchmarks  
Item 
Test Method 
Benchmark 
1.Appearance: 
²  eyeballing 
²  batteries  shall  be  free  from  any 
stains;  scratches  or  deformations, 
which  may  reduce  the  commercial 
value when visually inspected 
2.Size: 
²  caliper measurement。 
²  The  size  shall  comply  with  the 
specified  size  as  the  attached 
drawing  
3.Insulate 
impedance 
²  measured with a Megger overpack and 
battery electrode between the degree of 
insulation。 
²  outer sleeve shall exceed    10  
MΩ。 
4.Weight 
²  using disk-scale measurement。 
²  approximate  12.5 g。 
5.Charge Voltage 
²  Following a period of discharge at 
0.2CmA down to a terminal voltage of 
1.0V, standard charge, the cell or battery 
shall be checked at 5 minutes before 
finish charging。 
²  The voltage shall be less than   1.6  
V。 
6.Open circuit 
voltage: (O.C.V.) 
²  Following a standard charge period, the 
open circuit voltage of the cell or battery 
shall be checked within 1 hour.。 
²  The O.C.V. shall exceed 1.25 V                    
7.Closed circuit 
²  Following a standard charge period, the 
²  The C.C.V. shall exceed   1.2 V。