Fujitsu MAT3300FC 사용자 설명서

다운로드
페이지 460
Data Buffer Management 
 
3-12 
C141-C008 
3.2.3  Look-Ahead operation, Look-Ahead volume 
1)  Excluding the conditions in 3) and 4) for the amount of data specified as the 
minimum pre-fetch volume, data are read for look-ahead irrespective of track 
boundaries or cylinder boundaries.  Commands which are already in the 
queue or commands which are newly received while a look-ahead operation 
is in progress, are executed after the look-ahead operation is completed.  
However, if the new command is a READ or READ EXTENDED command, 
and it is a command in which the first specified logical data block is a 
sequential access data block, the command is executed without the look-
ahead operation being halted.  When a newly received command is a 
command which is not the object of caching, that command is executed 
immediately in parallel with a look-ahead operation. 
Also, in the case of a command which disables all data which are objects of 
caching (see Section 3.2.1 (3)), the look-ahead operation is halted and that 
command is executed immediately. 
2)  When commands exist in the queue, the look-ahead operation is halted at the 
point when reading of the specified amount of data at the minimum pre-fetch 
volume is completed, then execution of the new command starts.  When there 
are no commands that need to be newly executed, the data look-ahead 
operation is continued, even after the volume of data specified as the 
minimum amount of pre-fetch data have been read, until one of the following 
conditions, 1), 3) or 4), occurs. 
−  When "1" is specified in the DISC bit, if look-ahead of data equal in 
volume to a cache segment is completed. 
−  When "0" is specified in the DISC bit, if look-ahead of all the data is 
completed up to the track boundary or the cylinder boundary. 
3)  During a data look-ahead operation, when any error occurs, the data look-
ahead operation is terminated at that point (retry is not executed). 
4)  When receiving LIP (y, x), or when any INIT issues a TARGET RESET 
(FCP TASK MANAGEMENT), the look-ahead operation is terminated at 
that point and all the look-ahead data stored in the data buffer are invalidated. 
5)  During a look-ahead operation, if "sector slip processing" is applied, or 
defective sectors exist in the same cylinder to which "alternate processing" is 
applicable, the look-ahead operation is continued without interruption.