Pack Assembly and The bq3060
www.ti.com
11
Pack Assembly and The bq3060
This section describes a recommended assembly sequence for a bq3060-based battery pack. This
procedure results in the most time-efficient setup of the battery pack. Following are the steps for
connecting a 4-series cell battery to the bq3060EVM board. Review the application report bq20zxx EVM
Data Flash Settings for Number of Serial Cells and Pack Capacity
,
for further details on 2- and
3-series cell arrangements.
Figure 14. Connection Sequence
1. Connect the most negative terminal (– terminal of cell 1) of the serially-connected, 4-cell battery stack
to the 1N PIN of the TB1–TB2 connector as shown in
. (See also
for TB1–TB2
location).
2. Connect the positive terminal of cell 1 to 1P.
3. Connect the positive terminal of cell 2 to 2P.
4. Connect the positive terminal of cell 3 to 3P.
5. Connect the positive terminal of the battery stack (+) to 4P.
6. Connect external power (from 6 to 16.8V) to the Pack+ and Pack– terminals to wake up the EVM from
shutdown mode. External power does not need to remain connected once the bq3060 has exited
Shutdown Mode.
7. Connect the SMBus connector (J1) to the EV2300 adapter and start the EV software.
8. Navigate to the Flash Screen. Change the flash constants that correspond to the specific parameters
of your application (refer to the data sheet or other application reports). For the first evaluation, the
default values may be used.
9. Navigate to the Calibration screen. Select the check-box for CC Offset Calibration. Click the calibrate
part button. It should show OK.
10. Uncheck previously-selected boxes. Select the check-box for software voltage calibration near
Measured voltage field. Measure the actual cell 1N and 1P for cell 1, 1N and 2P for cell 1 + 2, 1N and
3P for cell 1 + 2 + 3, 1N and 4P for cell 1 + 2 + 3 + 4, and enter the values into the Enter actual
voltage 
field. Click the calibrate part button.
11. To enter Lifetime Data and PF, navigate to the Pro screen in the EV software. Make sure that the
Write SMB Word section reads: "SMB Command: 00 Word (hex): 0021" as shown in
and
click the Write button.
Figure 15. Fuel Gauging Command
12. Now the pack is ready. Simulate insertion into a system by shorting between the Sys Pres (System
Present) and the VSS pins on the connector. At this point, the discharge and charge FETs are ON (as
indicated by value of 0006 in the FET Status field in the SMB Screen of the EV software), and
charge/discharge tests can be conducted. This step in not needed if the NR bit (nonremovable pack) is
enabled in Operation Cfg B register.