MGE UPS Systems PULSAR EVOLUTION 3000 XL 사용자 설명서
3400723100/AD
- Page 13
H
ert
z
50
/6
z
50
/6
0
Hz
H
ert
z
50
/6
z
50
/6
0
Hz
A
m
p
s
1
6
A
M
A
X
V
ol
t
1
1
2
0
V
~
1
O
V
ol
t
1
1
2
0
V
~
1
O
W
/VA
1
540
W
/1
9
2
0
VA
V
ol
t: 72Vdc
40
A
A
A
C
O
u
tp
u
t
A
C
In
p
u
t
U
.S
. P
A
T. N
o.
6,0
94
,3
63
BA
TTERY
C
O
NN
EC
EC
TOR
U
.P
.S
.
R
34
Z
Z
5
A
C
In
p
ut
Programmable
2
Programmable
1
A
C
O
ut
p
ut
360
°
Rotation Plug
2.4 Connecting the protected equipment
CAUTION: Check that the indications on the rating plate on the back of the UPS correspond to your AC-power
system and to the actual electrical consumption of all the equipment to be connected to the UPS.
system and to the actual electrical consumption of all the equipment to be connected to the UPS.
1 - Remove the power cord supplying the
equipment to be protected.
- Pulsar Evolution 2200/3000/3000 XL:
Connect the supplied input power cord 10
to the AC power wall receptacle.
equipment to be protected.
- Pulsar Evolution 2200/3000/3000 XL:
Connect the supplied input power cord 10
to the AC power wall receptacle.
2 - Connect the protected equipment to the
UPS using the rotation power cord 25 . It
is advised to connect priority loads to the
four standard receptacles 8 and any non-
priority loads to the two programmable
receptacles 9 .
UPS using the rotation power cord 25 . It
is advised to connect priority loads to the
four standard receptacles 8 and any non-
priority loads to the two programmable
receptacles 9 .
If the UPS is connected to a com-
puter running MGE communica-
tions software, it is possible to pro-
gram the interruption of power to
the programmable receptacles 9
during operation on battery power,
thus reserving backup power for
the priority loads.
puter running MGE communica-
tions software, it is possible to pro-
gram the interruption of power to
the programmable receptacles 9
during operation on battery power,
thus reserving backup power for
the priority loads.
3 - Lock the connections using the securing
system 29 .
As soon as the UPS is energized, the
battery begins charging. Eight hours are
required to charge to the full rated back-
up time.
system 29 .
As soon as the UPS is energized, the
battery begins charging. Eight hours are
required to charge to the full rated back-
up time.
25
8
9
1
2
2. Installation
10
29
NOTE: Pulsar Evolution 3000 XL: At least one EXB additional battery module must be connected to the UPS because it
does not have internal batteries. See the EXB battery-module installation manual (Doc. no. 3400711600) for information
on making the connections.
does not have internal batteries. See the EXB battery-module installation manual (Doc. no. 3400711600) for information
on making the connections.