Index  40 
A 
about this guide   5 
areas prone to lightning or power surges   22 
assembly   31 
assembly area   24 
C 
cables, FCC compliance   36 
Canadian notices   36 
capacity limitations   7 
central facility infrastructure connections   17 
clearance area   8, 10 
cold weather considerations   22 
connection portals   17 
connections, additional   17 
connections, facility   17 
D 
delivery considerations   31 
dimensions   8 
E 
electrical power capacity   7 
electrical system   15 
environmental considerations   22 
environmental control system (ECS)   17 
environmental risks   22 
equipment, installation   24 
expansion   11 
F 
facility connections   17 
FCC (Federal Communications Commission) 
notice   35 
Federal Communications Commission (FCC) 
notice   35 
fire and safety   20 
fire suppression   6 
future expansions   11 
G 
grounding requirements   11 
H 
HP site preparation drawing package   23 
humidifier   20 
I 
installation   24 
installation equipment   24 
IT cable portals   17 
L 
lifting layout and requirements   24 
lightning protection   22 
M 
materials, piping   15 
mechanical cooling capacity   7 
modifications, FCC notice   35 
N 
network connections   17 
O 
other objects   25 
overview   5 
P 
permit requirements   23 
piping materials   15 
portals, connection   17 
power infrastructure installation   15 
power surges   22 
pre-delivery   31 
preparing for assembly   31 
project coordination   23 
proximity to utilities and drains   12 