HP Performance Optimized Data Center (POD) 40c 빠른 설정 가이드
Overview 6
Site assessment
HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP
POD 40c G2. Consult with HP to schedule a site assessment.
POD 40c G2. Consult with HP to schedule a site assessment.
Site preparation
Site preparation must be complete prior to the POD delivery to ensure a timely installation and
commissioning. The site must meet all pad, power, and chilled water requirements.
Site safety and security
Each customer site must have its own standard safety and security requirements. The HP Program Managers
work with the customer to ensure adherence to the appropriate precautions. HP is not responsible for
determining or enforcing safety or security requirements. The customer must conduct all health and safety
evaluations of the HP POD 40c G2, only using HP as a support mechanism.
evaluations of the HP POD 40c G2, only using HP as a support mechanism.
Fire detection and suppression
The fire suppression system, supplied as an optional component of the HP POD 40c G2, is a "Manufacturer
Designed" system specifically for this HP product, in compliance with national standards.
The HP standard suppression system includes a Novec 1230 clean agent system. However, if the customer
The HP standard suppression system includes a Novec 1230 clean agent system. However, if the customer
or local AHJ requires specific modifications or a replacement, HP can assist in these actions at the expense
of the customer.
HP does not certify that the fire suppression system installed in the HP POD 40c G2 meets all local and
jurisdictional requirements. The customer is responsible for the following actions as related to the fire
HP does not certify that the fire suppression system installed in the HP POD 40c G2 meets all local and
jurisdictional requirements. The customer is responsible for the following actions as related to the fire
suppression system:
•
Verifying that the POD suppression system meets local codes, including specific local requirements for
initial and periodic inspections.
initial and periodic inspections.
•
Arranging for and receiving all required local permits, including initial commissioning as well as
standard and repair maintenance.
standard and repair maintenance.
•
Arranging for the connection of the agent tanks, refilling of tanks, and all system testing, including
pressure tests. All general maintenance of the suppression system must be completed by an authorized
pressure tests. All general maintenance of the suppression system must be completed by an authorized
technician.
Additional local requirements are not covered as part of the option price or basic installation and
deployment services, unless specifically included in an executed Statement of Work.