HP Performance Optimized Data Center (POD) 20cp 설치 가이드
Site requirements 5
•
You have chilled water at your final location.
•
You have made provisions for properly grounding the HP POD.
System utilities
Your site location must accommodate the following utilities:
•
Cooling water
•
Electrical power
•
Drainage
Power
Item
Component
1
Chilled water supply connection
2
Chilled water return connection
3
External communication box (if fitted)
•
ECS
•
Fire
•
Security
•
Telephone