HP Performance Optimized Data Center (POD) 240a 서비스 매뉴얼
Overview 5
Overview
About this document
This document outlines the site requirements for an HP Performance Optimized Datacenter (POD) 240a. The
customer must provide a qualified architectural or consulting engineering team to generate site-specific
customer must provide a qualified architectural or consulting engineering team to generate site-specific
documents for each HP POD 240a installation, including final site drawings. The customer's site installation
design must comply with all local and national regulations, ordinances, codes, and the specifications listed
in this document.
Site assessment
HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP
POD 240a. Consult with HP to schedule a site assessment.
For more information, see the Site Assessment Checklist in the HP Performance Optimized Datacenter (POD)
For more information, see the Site Assessment Checklist in the HP Performance Optimized Datacenter (POD)
240a Site Preparation Guide.