Burnham Series V11 브로셔
Installation & Service Flexibility
The cast iron sectional design of the V11 boiler makes it easy to
maneuver through doorways and into the boiler room. In addi-
tion to being shipped as loose sections, the boiler is available
with factory-assembled sections or as a completely packaged
and fire-tested unit.
maneuver through doorways and into the boiler room. In addi-
tion to being shipped as loose sections, the boiler is available
with factory-assembled sections or as a completely packaged
and fire-tested unit.
•
Hassle-free Section Assembly
V11 boiler sections have reinforced lugs that are used
to assemble the sections with individual draw rods
resulting in fast, strain-free assembly.
resulting in fast, strain-free assembly.
The sections can be assembled using two common
toolsÑ a 3/4" drive ratchet with a 1-1/16" deep socket
and wrench.
and wrench.
The sections are surface ground to ensure
smooth surface mating. An elastic sealant and fiberglass
rope are used on all section joints for a completely sealed
and pressure-tight assembly.
rope are used on all section joints for a completely sealed
and pressure-tight assembly.
•
extensive Testing Methods
Each boiler section is hydrostatically tested at 2-1/2 times
the rated working pressure at the foundry. Factory-
assembled sections are tested a second time at 1.5 times the
rated working pressure.
rated working pressure.
•
Rear or Top Venting
As a forced draft boiler, the V11
provides optimum draft for controlled
efficiency, eliminating the need for
high chimneys or induced draft fans.
A unique feature of the V11 boiler
is that it can be vented from the
rear or the top. This enables easy
chimney or sidewall venting for
maximum installation flexibility.
Top outlet venting saves floor space
and reduces installation time and
high chimneys or induced draft fans.
A unique feature of the V11 boiler
is that it can be vented from the
rear or the top. This enables easy
chimney or sidewall venting for
maximum installation flexibility.
Top outlet venting saves floor space
and reduces installation time and
materials. A plugged tapping is
provided to take flue outlet pressure
readings.
provided to take flue outlet pressure
readings.
Available in twenty sizes with gross output ratings from
667 to 4551 MBH, the V11 Series is commonly used in
schools, hospitals, and other large commercial applications
where comfort and reliability are critical. The product meets
the energy efficiency requirements of ASHRAE 90.1 with
combustion efficiencies up to 85%.
Cast iron construction, ease of assembly, two venting options,
and stringent testing methods make the V11 Series boiler by
Burnham Commercial your commercial heating solution.
667 to 4551 MBH, the V11 Series is commonly used in
schools, hospitals, and other large commercial applications
where comfort and reliability are critical. The product meets
the energy efficiency requirements of ASHRAE 90.1 with
combustion efficiencies up to 85%.
Cast iron construction, ease of assembly, two venting options,
and stringent testing methods make the V11 Series boiler by
Burnham Commercial your commercial heating solution.
American-Made Cast Iron ConstructionÐ
BC25-HSi
Burnham CommercialÕ s unique
BC25-HSi cast iron formula has
an extremely high silicon content,
making it stronger and more
flexible than the iron used in
competitor's boiler sections. It offers
better thermal shock resistance and
greater heat transfer capabilities
than other cast iron products.
an extremely high silicon content,
making it stronger and more
flexible than the iron used in
competitor's boiler sections. It offers
better thermal shock resistance and
greater heat transfer capabilities
than other cast iron products.
BC25-HSi's properties allow Burnham Commercial to
maintain the highest level of quality from start to finish, and
provide a product that is optimized
for hydronic heating applications
provide a product that is optimized
for hydronic heating applications
.
•
Manufactured with Quality
Cast iron sections are produced at
Burnham Foundry LLC in Ohio,
ensuring quality and availability of
boiler sections.
ensuring quality and availability of
boiler sections.
•
Cast Iron nipple Difference
V11 sections are held together
using cast iron nipples, which
are well known as being of the
are well known as being of the
highest standard for boiler
construction. Unlike gaskets used
construction. Unlike gaskets used
by many other boiler
manufacturers, cast iron nipples are impervious to flue
gases, oils, petroleum-based chemicals and other
contaminants, which means fewer costly repairs and a
longer lasting boiler.
manufacturers, cast iron nipples are impervious to flue
gases, oils, petroleum-based chemicals and other
contaminants, which means fewer costly repairs and a
longer lasting boiler.
Cast Iron Commercial Water or Steam Boiler
V11
Series
Your Commercial Heating Solution!
2