Bunn OL 사용자 매뉴얼

다운로드
페이지 27
Page 5
PLUMBING REQUIREMENTS (Cont.)
Plumbing Hook-Up
Model OL15 has an attached water strainer, proceed to step 2.
Models OL20, OL35, & RL35, proceed as follows:
1.  Remove the rear panel and bottom pan.  Run the long piece of tubing from the strainer (supplied) under 
the brewer and attach it to the water inlet fitting on the bottom bracket.  Reinstall the bottom pan and rear 
panel.
2.  Flush the water line and securely attach it to the 1/4” flare fitting on the strainer.
3.  Turn on the water supply.
 
 
INITIAL SETUP
CAUTION - The brewer must be disconnected from the power source throughout the initial setup, except when 
specified in the instructions.
1.  Remove the top panel.
2.  Rotate the control thermostat knob fully counter-
clockwise to the “OFF” position and replace the 
panel.
3.  Insert an empty funnel into the funnel rails.
4.  Place a decanter containing a small amount of 
water on the warmer beneath the funnel.
5.  Connect the brewer to the power source, place 
the On/Off brew station warmer switch the up-
per  position,  and  momentarily  press  the  start 
switch. Water will begin flowing into the tank.  
When water stops flowing into the tank, initiate a 
second and a third brew cycle.  During this third 
brew cycle the tank will fill to its capacity and the 
excess will flow from the sprayhead, out of the 
funnel, and into the decanter.
NOTE - The On/Off brew station warmer switch must 
be  in  the  upper  position  to  initiate  and  complete  a 
brew cycle.
6.  Place the On/Off brew station warmer switch in 
the lower position.
7.  Disconnect the brewer from the power source.
8.  Remove the top panel.
9.  Rotate the control thermostat knob fully clockwise 
to the “ON” position and replace the panel.
10.  Connect the brewer to the power source and wait 
approximately twenty minutes for the water in the 
tank to heat to the proper temperature.  Some 
water will drip from the funnel during this time; 
this is due to expansion and should not occur 
thereafter.
11.  Place an empty decanter under the funnel.
12.  Place the On/Off brew station warmer switch in 
the  upper  position  and  momentarily  press  the 
start switch.  Empty the decanter after water has 
stopped flowing from the funnel.
13.  Allow the water in the tank to reheat to the proper 
temperature.
14.  Place an empty decanter on the warmer and press 
the start switch.  Check the water volume in the 
decanter after water has stopped flowing from 
the funnel.  It should be 64 ounces.
15.  If  not,  disconnect  the  brewer  from  the  power 
source and remove the top panel.
16.  Add or remove washers to the float on the level 
switch as required. Adding washers increases the 
volume, removing washers decreases it. Replace 
the top panel, connect the brewer to the power 
source, start, and measure another brew cycle.
17.  Repeat steps 13-16 until 64 oz water volume is 
achieved.
P1712
P1478
32430 121699