Zhone 4821-A2 사용자 설명서
Configuration
40
BitStorm 4800 Express Model 4821-A2 Installation Guide
4821-A2-ZN21-30
Startup Procedure for Inband Management
With inband management, the BitStorm 4800 Express is managed using the
uplink port.
uplink port.
To start up the BitStorm 4800 Express using inband management:
1 To avoid losing your connection when the IP address is changed, access
the CLI using the CONSOLE port.
2 Assign an IP address, netmask, and next-hop router using the configure
management command. For example:
PDYN# configure management inband address 137.90.127.3
255.255.255.0
PDYN# configure management default-gateway 137.90.127.1
PDYN# configure management default-gateway 137.90.127.1
Do not configure inband and out-of-band management on the same
subnet.
Startup Procedure for Out-of-Band Management
In out-of-band management, you manage the unit through Port 1.
To start up the BitStorm 4800 Express using out-of-band management:
1 To avoid losing your connection when the IP address is changed, access
the CLI using the CONSOLE port.
2 Assign an IP address, netmask, and next-hop router using the configure
management command. For example:
PDYN# configure management out-of-band address 137.90.80.3
255.255.255.0
PDYN# configure management default-gateway 137.90.80.1
PDYN# configure management default-gateway 137.90.80.1
You can now access the web interface by typing into the Location field of
Do not configure inband and out-of-band management on the same
subnet.
3 Configure routers as necessary to route data from the NOC to the
BitStorm 4800 Express.